Skate Park

Distrito de Quinto, Spain

Skatepark Entrenúcleos

Surface
Concrete
Hours
Open 24/7
Size
About 980 m²

Now

Rain, 48 h back and 24 ahead

Next days

Good to know

Surface
Concrete
Size
About 980 m² (11,000 sq ft)
Hours
Open 24/7

Clips

No clips yet

Each will be pinned to the feature ridden.

Riders’ photos

No photo of this spot yet. Yours would be the first, on its page with your name, once a moderator has checked it.

Sign in to add your photo

Print a sign for the gate